作者: Joachim R. Daduna , Stefan Voß
DOI: 10.1007/978-3-642-57762-8_4
关键词:
摘要: In complex networks schedule synchronization has a major importance when constructing timetables. Restrictions in this field are based on the structure and complexity of existing network, different headways, origin-destination pairs demand structure. With respect to service quality one main objective coming mind consists minimizing sum all waiting times passengers at transfer nodes transit system. Furthermore, modifications such an function incorporating maximum time may have be observed as well interrelationships between level operating cost.