作者: Martin Pexa , Tomas Hladik , Zdenek Ales , Vaclav Legat , Miroslav Muller
DOI: 10.1109/QR2MSE.2013.6625655
关键词:
摘要: The paper brings a proposal of new methodology for application well-known tools - RCM, RBI and SIFpro with the aim to treat risks by means suitable maintenance. basis is complex all three methods at same time not separately as typical today. proposed suggests having just one managing team Reliability Risk Treatment Centred Maintenance (RRTCM) employing existing RBI, concurrently. This approach allows significant reduction engineering activities' duration. In these activities are staged into 5 phases structured in order eliminate duplicities resulting from separate tools. newly saves 45% 50% workload adequate financial savings.