作者: S. C. Reed , J. Zirschky
DOI:
关键词:
摘要: The operation of six duckweed treatment systems is briefly reviewed. Significant design considerations include a 20-day detention time for algae removal in wastewater lagoons, 10-day constructed wet land, and additional cells that do not adequately re move soluble BOD. Provisions are recommended moval post aeration case the dies from dis ease. necessity windbreaks, baffles, screening to keep place explained. /. Water Pollut. Control Fed., 60,1253(1988).