Solar Power Integration on the Seychelles Islands

作者: Thomas Ackermann , Nis Martensen , Tom Brown

DOI:

关键词:

摘要: The Seychelles aim to cover 5% of electricity with renewables by 2020 and 15% 2030. local power system operator commissioned a Grid Absorption Study determine the technical limits for reaching these targets. study focussed on how much photovoltaic (PV) generation grid can absorb. As result, primary bottleneck was found be maintenance backup reserves compensate fast down-ramping PV generation.