Downhole Sand Control Assembly with Flow Control, and Method for Completing a Wellbore

作者: Michael T. Hecker , Michael D. Barry , Charles S. Yeh

DOI:

关键词:

摘要: A method for completing a wellbore in subsurface formation includes providing first base pipe and second pipe. Each comprises tubular body forming primary flow path. has transport conduits along an outer diameter transporting fluids as secondary The also connecting the pipes using coupling assembly. assembly manifold, port adjacent manifold that places path fluid communication with running into wellbore, then causing to travel between paths. sand screen is provided allows control of

参考文章(94)
Richard Claude Jannise, Ronald G. Dusterhoft, Janet Roper, Method and apparatus for improved fracpacking or gravel packing operations ,(2001)
Dave Morvant, Terje Gunneroed, Knitted wire fines discriminator ,(2002)
Stephen Reid, Lee Mercer, Andrew J. Elrick, Petrus A.J. Stevens, Iain M. Macleod, David A. Howell, Charles S. Yeh, Michael D. Barry, Michael T. Hecker, Wellbore apparatus and methods for zonal isolation and flow control ,(2011)
Terje Gunneroed, Stephen L. Ward, Paul Vorkinn, Well screen primary tube gravel pack method ,(2004)
James Zachman, Elmer Peterson, Luis Mendez, Martin P. Coronado, Steve Crow, Gravel pack multi-pathway tube with control line retention and method for retaining control line ,(2006)
Ole Sv. Kvernstuen, Kjartan Roaldsnes, Downhole cable protection device ,(2002)