作者: Kevin House , Michel Veillette
DOI:
关键词:
摘要: When a metering coupled to network loses its primary power source and has secondary source, such as super-capacitor, it recognizes reports outage. In this case, the head end server may verify outage report by querying through downstream nodes about node no will fail make regularly scheduled at appropriate time. Consequently, polling HAN deduce whether