搜索历史记录选项已关闭,请开启搜索历史记录选项。
作者: Omer Gurpinar , Stephen Dyer , John Algeroy , Marian Faur
DOI:
关键词:
摘要: First equipment is provided in a first lateral branch of well, and second the well. Cross-lateral logging performed using corresponding branches.
,2013, 引用: 2
,2012, 引用: 52
,2014, 引用: 0
,2014, 引用: 7
,2015, 引用: 1
,2013, 引用: 1
,2014, 引用: 9
,2016, 引用: 6
,2014, 引用: 2