Application of Snapback Chronometry Method in Calculation of Regulation

作者: Elvis Žic , Nikša Jajac , Ivan Marović

DOI: 10.17265/1934-7359/2011.03.009

关键词:

摘要: Work study is an area of construction production rationalization in which with scientific, logical, holistic and system analysis methods the process we gain optimum way work time work. Chronometry method one appropriate for recording shorter cyclic processes based on statistical sampling theory. Determination times performances standard machines (SCCM) key assumptions dynamic planning machine every site. Calculation SCCM are basic research objects field organization technology. Study shows applied chronometry machine. Goal this to accomplish regulation through measured cycle compare effects obtained methodology calculating hydraulic excavator practical achievement gaining order determine main reasons effect performance