Method of completing and producing long lateral wellbores

作者: Lloyd Murray Dallas

DOI:

关键词:

摘要: Long lateral wellbores are prepared for the production of hydrocarbons by preparing only a portion wellbore at time, starting remote end long wellbore. The section is produced until becomes uneconomic before further and produced.

参考文章(49)
Peter J. Pelensky, Ben I. Nzekwu, Peter D. Sametz, Single horizontal wellbore gravity drainage assisted steam flooding process ,(1995)
In-Yao Lee, Chung-Cheng Chou, Tsung-Ping Hsu, ShangShi Wu, Hung-Sheng Hu, Wei-Lin Chen, Method for fluid injector ,(2006)
Barton Sponchia, Lance M. Rayne, Michael William Rea, Thales De Oliveira, John Algeroy, Lateral wellbore completion apparatus and method ,(2013)
Jeffry A. Siegel, Wai-Nang P. Lee, Michael D. Harpen, Method for evaluating thyroid function ,(1981)
David J. Hassan, Earl M. Jensen, Michael D. Chernichen, Method of producing a communicating horizontal well network ,(1997)
Alcino R. de Almeida, Paulo César Ribeiro Lima, Method and apparatus for exploiting oilfields ,(2004)