作者: Andrew D. Penno , Patrick P. Bourgneuf , Maxime P. Coffin
DOI:
关键词:
摘要: A method of completing at least a portion an open-hole wellbore comprises: positioning sand control assembly in the wellbore, wherein comprises screen; one conduit adjacent to assembly; sheath is non-porous tubular, and positioned such that annulus exists between inside wall outside both, conduit; introducing treatment fluid into wellbore.