Methods of preventing premature fracturing of a subterranean formation using a sheath

作者: Andrew D. Penno , Patrick P. Bourgneuf , Maxime P. Coffin

DOI:

关键词:

摘要: A method of completing at least a portion an open-hole wellbore comprises: positioning sand control assembly in the wellbore, wherein comprises screen; one conduit adjacent to assembly; sheath is non-porous tubular, and positioned such that annulus exists between inside wall outside both, conduit; introducing treatment fluid into wellbore.

参考文章(8)
Travis T. Hailey, Philip D. Nguyen, Ronald W. McGregor, William David Henderson, Robert W. Crow, Apparatus and method for treating an interval of a wellbore ,(2004)
Bennett M. Richard, Paul M. Mcelfresh, Chad F. Williams, Method for providing a temporary barrier in a flow pathway ,(2004)
Kjartan Roaldsnes, Arthur H. Dybevik, David C. Haeberle, Knut H. Nesland, Michael T. Hecker, Ted A. Long, Michael D. Barry, Charles S. Yeh, Hans Brekken, Lars Faret, Ole Sveinung Kvernstuen, Terje Moen, Jon Blacklock, Wellbore method and apparatus for completion, production and injection ,(2006)
R Swanson, Pulsing gravel pack tool ,(1972)
Lloyd G. Jones, Method for gravel packing wells ,(1989)