Post-Bam earthquake: recovery and reconstruction.

作者: Mohsen Ghafory-Ashtiany , Mahmood Hosseini

DOI: 10.1007/S11069-007-9108-3

关键词:

摘要: … the construction of emergency shelters and temporary … donations, 28 by funds from foreign countries and ten with the … experience at the national level, as very little experience had been …

参考文章(4)
M. Ghafory‐Ashtiany, Rescue operation and reconstruction of recent earthquakes in Iran Disaster Prevention and Management. ,vol. 8, pp. 5- 20 ,(1999) , 10.1108/09653569910258174
Babak Omidvar, Hossein Zafari, Sahar Derakhshan, Reconstruction management policies in residential and commercial sectors after the 2003 bam earthquake in Iran Natural Hazards. ,vol. 54, pp. 289- 306 ,(2010) , 10.1007/S11069-009-9468-Y
M.R. Ghayamghamian, E. Haghshenas, F. Askari, H. Hamzehloo, M. Kamalian, A. Shafiee, M. Davoodi, M.K. Jafari, A. Azadi, O. Ravanfar, A. Sohrabi-Bidar, M. Keshavarz, PRELIMINARY SEISMIC MICROZONATION OF BAM Journal of Seismology and Earthquake Engineering. ,vol. 5, pp. 69- 80 ,(2004)
Mohsen Ghafory-Ashtiany, Victoria Kianpour Atabaki, Zenab Bagha, Saroj Komar Jha, Kamal Kishore, Frederick Lyons, A United Nations Strategy for Support to the Government of the Islamic Republic of Iran Following the Bam Earthquake of 26 December 2003 Journal of Seismology and Earthquake Engineering. ,vol. 5, pp. 217- 227 ,(2004)