作者: Doug Beattie , Maurice A Bujold
DOI:
关键词:
摘要: A method is described for supporting a bundle of cables in well or length coiled tubing deployed vertical deviated during process assembly heater which includes steps injecting the from respective spools into tubing. The of: attaching an open-ended cable support adapter to up-hole end tubing, clamp above adapter; cutting their clamp; clamping wedging tube carrier raising bundle; removing lowering insert and cables.