作者: Ting Pang , Jerry Y. S. Lin
DOI: 10.1007/S12204-015-1612-0
关键词:
摘要: A new conceptual water-gas-shift (WGS) process is designed for integrated gasification combined cycle (IGCC), using membrane reactor (MR) equipped with H2-permselective zeolite membranes the WGS reaction. The makes it possible to capture CO2 before power generation by converting CO in syngas which can be collected after also produces purer H2 combustion gas turbine. Conceptual design of MR, mass and heat balance analysis, cost estimation are provided this paper.