作者: Md Shafiullah , Hamidur Rahman , Md Quamrul Ahsan
DOI: 10.1109/ICECE.2012.6471617
关键词:
摘要: Formation of island may be inadvertent which is due to system fault or intentional for a purpose maintenance. Generally fall frequency lead by abnormal condition power and sometimes blackout an integrated occurred extreme abnormality. Though traditionally, interconnection standards avoid islanding operation but in case emergency islands can support local supplies critical important loads improve the service reliability. This paper presents different studies impact on as well develops based auto load shedding scheme addition generation loss island. The has been applied seven bus test validate effectiveness developed various conditions have simulated.