作者: David P. Lavigne , Mithun R. Kamat , Guang-Yan Zhu , Sara E. Atkinson , Aaron W. Morrow
DOI:
关键词:
摘要: An on-site power plant (24) has a controller (40) that selectively controls operation of prime movers (26, 28, 30). In one example, the changes number operating responsive to transient in load (22) requirement while continuing operate at least movers. One example includes prioritizing 30) for based upon needs cogeneration unit (32, 34, 36) associated with providing temperature control function within facility. Another controlling capacity fueling