作者: F Pietrowiak
DOI:
关键词:
摘要: Installation for the manufacture of finished concrete components including a transfer crane system interconnecting plurality operative work stations in predetermined flow path traversed by transport wagons; said being adapted to provide sequence, forming pouring mold, positioning mold on wagon, reinforcing elements concrete, insertion into and vibrating hardening finishing continuous pattern.