作者: Caimao Tan , Junliang He , Hang Yu , Yu Wang
DOI: 10.1016/J.AEI.2021.101252
关键词:
摘要: Abstract Due to high labour costs and difference of QC driver’s handling efficiency existing between day night, factors concerning drivers can significantly impact the schedule berth allocation quay crane assignment. This paper tackles assignment problem considering driver cost, operating performance-related pay night. How driver-related affect schedules is analyzed, objective composition including cost given. A mixed integer programming model with acceleration algorithms developed for proposed problem, a meta-heuristic framework three-stage algorithm solving problem. Numerical experiments are conducted validate effectiveness performance approach, leading multitude managerial insights.