作者: M A Rawlings , L R Anderson , J A Caliendo
DOI:
关键词:
摘要: The purpose of this research project was to design and build a model pile group according similitude parameters test it under cyclic lateral loading conditions obtain data that will expand the knowledge on behavior groups when subjected loads. Detailed descriptions are given regarding construction instrumented piles, other instrumentation, acquisition system. Step-by-step procedures for calibration all instrumentation as well testing setup procedure. Great detail is used in covering these topics event some effort must be duplicated future. Results four types output explained discussed, comparisons with predictions made using computer software.