Time-to-Build and Cycles

作者: Patrick K. Asea , Patrick K. Asea , Paul J. Zak

DOI:

关键词:

摘要: We analyze the dynamics of a simple growth model in which production occurs with delay while new capital is installed (time-to-build). The time-to-build technology shown to yield system functional (delay) differential equations unique steady state. demonstrate that state, though typically saddle, may exhibit Hopf cycles on measurable set parameter space. Furthermore, optimal path state oscillatory. A counter-example claim intrinsically oscillatory central technical apparatus mathematics equations.

参考文章(8)
JOSEPH M. MAHAFFY, KATHRYN M. JOINER, PAUL J. ZAK, A GEOMETRIC ANALYSIS OF STABILITY REGIONS FOR A LINEAR DIFFERENTIAL EQUATION WITH TWO DELAYS International Journal of Bifurcation and Chaos. ,vol. 05, pp. 779- 796 ,(1995) , 10.1142/S0218127495000570
Nathaniel Chafee, A bifurcation problem for a functional differential equation of finitely retarded type Journal of Mathematical Analysis and Applications. ,vol. 35, pp. 312- 348 ,(1971) , 10.1016/0022-247X(71)90221-6
Finn E. Kydland, Edward C. Prescott, TIME TO BUILD AND AGGREGATE FLUCTUATIONS Econometrica. ,vol. 50, pp. 1345- 1370 ,(1982) , 10.2307/1913386
Aldo Rustichini, Hopf bifurcation for functional differential equations of mixed type Journal of Dynamics and Differential Equations. ,vol. 1, pp. 145- 177 ,(1989) , 10.1007/BF01047829
Yannis M. Ioannides, Bart Taub, On dynamics with time-to-build investment technology and non-time-separable leisure☆ Journal of Economic Dynamics and Control. ,vol. 16, pp. 225- 241 ,(1992) , 10.1016/0165-1889(92)90032-A