SIMPLIFIED SIMULATION SYSTEM FOR CONSTRUCTION PROJECTS

作者: Bolivar A. Senior , Daniel W. Halpin

DOI: 10.1061/(ASCE)0733-9364(1998)124:1(72)

关键词:

摘要: A new scheduling system based on statistical simulation is discussed. The system, called project-integrated cyclic analysis of serial operations (PICASSO), blends and enhances two existing techniques, namely, the critical path method (CPM) network (CYCLONE) simulation. PICASSO project diagram consists a circle for each modeled resource, box repeated activity, arrows connecting these elements. elements can be cycled as many times required; thus repetitive activity chain needs to depicted only once. massiveness CPM similar techniques when applied model projects avoided altogether. also quality information normally found in Its procedures yield resource utilization statistics float. forward pass procedure computes early start dates provides data well backward calculations. latter algorithm float chain. Application examples illustrate development implementation method.

参考文章(19)
Julio Martinez, Photios G. Ioannou, Robert I. Carr, State and Resource Based Construction Process Simulation Computing in Civil Engineering. pp. 177- 184 ,(1994)
Rong-Yau Huang, Daniel W. Halpin, Dynamic Interface Simulation for Construction Operations (DISCO) Automation and robotics in construction X: proceedings of the 10th International Symposium on Automation and Robotics in Construction (ISARC). pp. 503- 510 ,(1993) , 10.22260/ISARC1993/0065
Shlomo Peer, Network Analysis and Construction Planning Journal of the Construction Division. ,vol. 100, pp. 203- 210 ,(1974) , 10.1061/JCCEAZ.0000427
Robert I. Carr, Walter L. Meyer, Planning Construction of Repetitive Building Units Journal of the Construction Division. ,vol. 100, pp. 403- 412 ,(1974) , 10.1061/JCCEAZ.0000444
Robert M. O'Keefe, Ruth M. Davies, Simulation Modelling With Pascal ,(1989)
Daniel W. Halpin, Leland S. Riggs, Planning and analysis of construction operations ,(1992)
Bolivar A. Senior, Late-Time Computation for Task Chains Using Discrete-Event Simulation Journal of Construction Engineering and Management-asce. ,vol. 121, pp. 397- 403 ,(1995) , 10.1061/(ASCE)0733-9364(1995)121:4(397)
Gregory Howell, Alexander Laufer, Glenn Ballard, Interaction between subcycles: one key to improved methods Journal of Construction Engineering and Management-asce. ,vol. 119, pp. 714- 728 ,(1993) , 10.1061/(ASCE)0733-9364(1993)119:4(714)
R. L. Tucker, A. Laufer, Is construction project planning really doing its job? A critical examination of focus, role and process Construction Management and Economics. ,vol. 5, pp. 243- 266 ,(1987) , 10.1080/01446198700000023