作者: Patrick Moratori , Sanja Petrovic , José Antonio Vázquez-Rodríguez
DOI: 10.1007/S10489-010-0215-6
关键词:
摘要: This paper investigates the problem of inserting new rush orders into a current schedule real world job shop floor. Effective rescheduling methods must achieve reasonable levels performance, measured according to certain cost function, while preserving stability floor, i.e. introducing as few changes possible schedule. proposes and effective match-up strategies which modify only part in order accommodate arriving jobs. The proposed are compared with other such "right shift" "insertion end", optimal respect but poor "total rescheduling" is performance stability. Our results statistical analysis reveal that comparable end" good performance.