PROGRAMAÇÃO DE FROTA DE EMBARCAÇÕES DE LANÇAMENTO DE DUTOS

作者: São Paulo , Escola Politécnica

DOI:

关键词:

摘要:

参考文章(29)
Evgeny Selensky, Patrick Prosser, J. Christopher Beck, Vehicle routing and job shop scheduling: what's the difference? international conference on automated planning and scheduling. pp. 267- 276 ,(2003)
Marius M. Solomon, Jacques Desrosiers, François Soumis, Yvan Dumas, Time Constrained Routing and Scheduling Les Cahiers du GERAD. pp. 1- 152 ,(1992)
Andrew C. Palmer, Roger A. King, Subsea Pipeline Engineering ,(2004)
Antoine Jouglet, David Savourey, Dominance rules for the parallel machine total weighted tardiness scheduling problem with release dates Computers & Operations Research. ,vol. 38, pp. 1259- 1266 ,(2011) , 10.1016/J.COR.2010.12.006
Z. Kouki, B. Fayech Chaar, S. Hammadi, M. Ksouri, Analogies between flexible job shop scheduling and vehicle routing problems industrial engineering and engineering management. pp. 880- 884 ,(2007) , 10.1109/IEEM.2007.4419317
Yasin Unlu, Scott J. Mason, Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems Computers & Industrial Engineering. ,vol. 58, pp. 785- 800 ,(2010) , 10.1016/J.CIE.2010.02.012
Fred Glover, Surrogate Constraint Duality in Mathematical Programming Operations Research. ,vol. 23, pp. 434- 451 ,(1975) , 10.1287/OPRE.23.3.434
L Bodin, B. Golden, A. Assad, M. Ball, ROUTING AND SCHEDULING OF VEHICLES AND CREWS–THE STATE OF THE ART Computers & Operations Research. ,vol. 10, pp. 69- 211 ,(1983)
N. Christofides, J.E. Beasley, Extensions to a Lagrangean relaxation approach for the capacitated warehouse location problem European Journal of Operational Research. ,vol. 12, pp. 19- 28 ,(1983) , 10.1016/0377-2217(83)90179-0