Optimising a two-echelon capacity-constrained material requirement manufacturing system using a linear programming model

作者: Héctor Hernán Toro Díaz , Liliana Delgado Hidalgo

DOI:

关键词:

摘要: Se implementa un modelo de programacion lineal entera mixta que representa sistema manufactura dos escalones, con la intencion determinar decisiones optimas aprovisionamiento materias primas o componentes. El se pro- grama usando software modelacion algebraica y integra a una herramienta computacional desde cual administra el ingreso los parametros obtencion resultados. es validado en ambiente real manufactura, observando ademas representar fielmente obtienen minimizan costo total, ob- jetivo del modelo, las cuales no llegaria esquema calculo propuesto por MRP.

参考文章(11)
Anders Segerstedt, Formulas of MRP International Journal of Production Economics. pp. 127- 136 ,(1996) , 10.1016/0925-5273(95)00163-8
Bhaba R. Sarker, Gyana R. Parija, An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy Journal of the Operational Research Society. ,vol. 45, pp. 891- 900 ,(1994) , 10.1057/JORS.1994.141
A.M.M. Jamal, Bhaba R. Sarker, An optimal batch size for a production system operating under a just-in-time delivery system International Journal of Production Economics. ,vol. 32, pp. 255- 260 ,(1993) , 10.1016/0925-5273(93)90072-S
J. Mula, R. Poler, J.P. Garcia, MRP with flexible constraints: A fuzzy mathematical programming approach Fuzzy Sets and Systems. ,vol. 157, pp. 74- 97 ,(2006) , 10.1016/J.FSS.2005.05.045
DAMODAR Y. GOLHAR, BHABA R. SARKER, Economic manufacturing quantity in a just-in-time delivery system International Journal of Production Research. ,vol. 30, pp. 961- 972 ,(1992) , 10.1080/00207549208942936
Peter J. Billington, John O. McClain, L. Joseph Thomas, Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction Management Science. ,vol. 29, pp. 1126- 1141 ,(1983) , 10.1287/MNSC.29.10.1126
Mehmet Mutlu Yenisey, A flow-network approach for equilibrium of material requirements planning International Journal of Production Economics. ,vol. 102, pp. 317- 332 ,(2006) , 10.1016/J.IJPE.2005.04.002
Vijay S. Nori, Bhaba R. Sarker, Cyclic Scheduling for a Multi-product, Single-facility Production System Operating Under a Just-in-time Delivery Policy Journal of the Operational Research Society. ,vol. 47, pp. 930- 935 ,(1996) , 10.1057/JORS.1996.118
Alistair R Clark, Optimization approximations for capacity constrained material requirements planning International Journal of Production Economics. ,vol. 84, pp. 115- 131 ,(2003) , 10.1016/S0925-5273(02)00400-0
Bhaba R. Sarker, Gyana R. Parija, Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system European Journal of Operational Research. ,vol. 89, pp. 593- 608 ,(1996) , 10.1016/0377-2217(94)00277-0