Simulation and Visualization for Project Planning and Management

作者: Gabriel A. Burnett , Yuanxin Charles Hu

DOI:

关键词:

摘要: A method and apparatus for generating a project plan from description information (206) comprising plurality of tasks (110). The may include describing precedence relationships between the (110), indicating durations variability (116) in simulation model (228) is generated using (206). run runs (234) to identify subset (110) forming critical path generate results data (248). network presentation (256) includes identified (1101) path.

参考文章(11)
Charles Cadwallader, Column node (CN) ,(2002)
Jason A. Warlikowski, Michael N. Carr, David W. Rolin, Anne E.F. Alvarado, Richard K. Ware, Douglas B. Toland, Mary-Anne G. Wolf, Daniel L. Leary, Project Management System For Integrated Project Schedules ,(2009)
Raymond Levitt, John Kunz, Marc Ramsey, Carlos Rivero, Charles Thaeler, Yan Jin, Project management system and method ,(2009)
Nathan R. Marigoni, Neil R. Wyler, Jay H. Poulsen, Jerald D. Poulsen, Project manager system and method ,(2006)