General Electric ATS Program technical review Phase 2 activities

作者: D. Smith , T. Chance

DOI:

关键词:

摘要: The Advanced Turbine Systems (ATS) Program Phase 2 objectives are to select a cycle, and identify resolve technical issues required realize the ATS goals of 60% net combined cycle efficiency, single digit NOx, 10% electric power cost reduction, compared current technology. efforts have showns that achievable. GE Power Generation advanced gas turbine will use closed-loop steam cooling in first two stages coatings, seals designs meet performance electricity goals.