作者: I. S. Mustafa , N. M. Din , A. Ismail , R. M. Redzuwan , R. C. Omar
DOI: 10.1109/SCORED.2013.7002634
关键词:
摘要: For the past 5 decades, a major number of Tenaga Nasional Berhad (TNB) transmission towers that traversed throughout Peninsular Malaysia have already existed. Some tower located at mountainous terrain and suspected to be insecure risky. One method is monitoring landslide in real-time, by deploying various sensor high risk area. This paper presents applicability multicriteria decision making (MCDM) method, specifically Analytical Hierarchy Process (AHP) select wireless communication technology for transmitting data control centre. Criteria influence selection are technical, economical, infrastructure functionality. On other hand, four alternative options fiber optical network, cellular, LAN zigBee.