Productivity Equations for Multiple Wells System in Anisotropic Reservoirs

作者: J. Lu , D. Tiab

DOI: 10.2118/2008-099

关键词:

摘要:

参考文章(5)
J. Maeda, Development and Application of the SMART System Automation and Robotics in Construction Xi#R##N#Proceedings of the 11th International Symposium on Automation and Robotics in Construction. pp. 457- 464 ,(1994) , 10.1016/B978-0-444-82044-0.50064-3
Rodolfo Camacho-V., Agustin Galindo-N., Michael Prats, Buildup Solution in a System With Multiple Wells Producing at Constant Wellbore Pressures Spe Reservoir Evaluation & Engineering. ,vol. 5, pp. 278- 283 ,(2002) , 10.2118/79104-PA
Jing Lu, Djebbar Tiab, Jalal Farhan Owayed, Steady State Productivity Equations for a Vertical Well in Anisotropic Sector Fault, Channel, and Rectangular Reservoirs Journal of Energy Resources Technology-transactions of The Asme. ,vol. 131, pp. 013102- ,(2009) , 10.1115/1.3066429
T. Marhaendrajana, T.A. Blasingame, Decline Curve Analysis Using Type Curves - Evaluation of Well Performance Behavior in a Multiwell Reservoir System SPE Annual Technical Conference and Exhibition. ,(2001) , 10.2118/71517-MS
Jing Lu, Djebbar Tiab, Productivity equations for an off-center partially penetrating vertical well in an anisotropic reservoir Journal of Petroleum Science and Engineering. ,vol. 60, pp. 18- 30 ,(2008) , 10.1016/J.PETROL.2007.04.011