作者: Jack M. Burns , Don A. Bresie , Donald W. Fowler
DOI:
关键词:
摘要: Natural gas wells in a tight formation area are drilled and completed with piping, the piping being capped Christmas tree. The is then utilized as reservoir to collect natural from over prolonged time period. Mobile pressure vessel units employed periodically recover collected gas, on schedule designed for maximum economic efficiency. In preferred embodiment, formed between inner production tubing outer casing tubing, conduits connected direct into reservoir. Liquid/gas separators dehydrator necessary, so that stored ready transport.