Heuristics for workforce planning with worker differences

作者: John W. Fowler , Pornsarun Wirojanagud , Esma S. Gel

DOI: 10.1016/J.EJOR.2007.06.038

关键词:

摘要: This study considers decisions in workforce management assuming individual workers are inherently different as measured by general cognitive ability (GCA). A mixed integer programming (MIP) model that determines staffing (i.e., hire, cross-train, and fire) order to minimize related costs over multiple periods is described. Solving the MIP for a large problem instance size computationally burdensome. In this paper, two linear (LP) based heuristics solution space partition approach presented reduce computational time. genetic algorithm was also implemented an alternative method obtain better solutions comparison proposed. The were applied realistic manufacturing systems with number of machine groups. Experimental results shows performance LP surprisingly good indicate can solve instances effectively reasonable effort.

参考文章(29)
Alan P. French, John M. Wilson, Heuristic Solution Methods for the Multilevel Generalized Assignment Problem Journal of Heuristics. ,vol. 8, pp. 143- 153 ,(2002) , 10.1023/A:1017900606269
George Vairaktarakis, Janice Kim Winch, Worker Cross-Training in Paced Assembly Lines Manufacturing & Service Operations Management. ,vol. 1, pp. 112- 131 ,(1999) , 10.1287/MSOM.1.2.112
Bryan A. Norman, Wipawee Tharmmaphornphilas, Kim Lascola Needy, Bopaya Bidanda, Rona Colosimo Warner, Worker assignment in cellular manufacturing considering technical and human skills International Journal of Production Research. ,vol. 40, pp. 1479- 1492 ,(2002) , 10.1080/00207540110118082
Robert L Thorndike, The role of general ability in prediction Journal of Vocational Behavior. ,vol. 29, pp. 332- 339 ,(1986) , 10.1016/0001-8791(86)90012-6
K.F. Man, K.S. Tang, S. Kwong, Genetic algorithms: concepts and applications [in engineering design] IEEE Transactions on Industrial Electronics. ,vol. 43, pp. 519- 534 ,(1996) , 10.1109/41.538609
D. A. Nembhard, HEURISTIC APPROACH FOR ASSIGNING WORKERS TO TASK BASED ON INDIVIDUAL LEARNING RATES International Journal of Production Research. ,vol. 39, pp. 1968- 1995 ,(2001) , 10.1080/00207540110036696
Michael J. Showalter, Vincent A. Mabert, An Evaluation of a Full‐/Part‐time Tour Scheduling Methodology International Journal of Operations & Production Management. ,vol. 8, pp. 54- 71 ,(1988) , 10.1108/EB054849
H. Aytug, M. Khouja, F. E. Vergara, Use of genetic algorithms to solve production and operations management problems: A review International Journal of Production Research. ,vol. 41, pp. 3955- 4009 ,(2003) , 10.1080/00207540310001626319
Alain Billionnet, Integer programming to schedule a hierarchical workforce with variable demands European Journal of Operational Research. ,vol. 114, pp. 105- 114 ,(1999) , 10.1016/S0377-2217(98)00182-9
A. C. EBELING, C.-Y. LEE, Cross-Training Effectiveness and Profitability International Journal of Production Research. ,vol. 32, pp. 2843- 2859 ,(1994) , 10.1080/00207549408957104