ELECTRE method using interval-valued intuitionistic fuzzy sets and possibility theory for multi-criteria decision making problem resolution

作者: Fatma Dammak , Leila Baccour , Abdelkarim Ben Ayed , Adel M. Alimi

DOI: 10.1109/FUZZ-IEEE.2017.8015408

关键词:

摘要: In this work we propose an approach of multi-criteria decision making (MCDM) using Elimination Et Choice Transiting Reality (ELECTRE) methods, interval-valued intuitionistic fuzzy (IVIF) sets and possibility theory. The proposition concerns the computation concordance discordance measures. proposed is applied to select best investment projects problem from literature. Therefore results are compared concluding remarks given.

参考文章(24)
Didier Dubois, Petr Hájek, Henri Prade, Knowledge-Driven versus Data-Driven Logics Journal of Logic, Language and Information. ,vol. 9, pp. 65- 89 ,(2000) , 10.1023/A:1008370109997
Leila Baccour, Adel M. Alimi, Robert I. John, Intuitionistic fuzzy similarity measures and their role in classification Journal of intelligent systems. ,vol. 25, pp. 221- 237 ,(2016) , 10.1515/JISYS-2015-0086
J.P. Brans, Ph. Vincke, B. Mareschal, HOW TO SELECT AND HOW TO RANK PROJECTS: THE PROMETHEE METHOD European Journal of Operational Research. ,vol. 24, pp. 228- 238 ,(1986) , 10.1016/0377-2217(86)90044-5
Behnam Vahdani, Amir Haji Karim Jabbari, Vahid Roshanaei, Mostafa Zandieh, Extension of the ELECTRE method for decision-making problems with interval weights and data The International Journal of Advanced Manufacturing Technology. ,vol. 50, pp. 793- 800 ,(2010) , 10.1007/S00170-010-2537-2
Bernard Roy, THE OUTRANKING APPROACH AND THE FOUNDATIONS OF ELECTRE METHODS Theory and Decision. ,vol. 31, pp. 49- 73 ,(1991) , 10.1007/BF00134132
L.A. Zadeh, Fuzzy sets as a basis for a theory of possibility Fuzzy Sets and Systems. ,vol. 100, pp. 9- 34 ,(1999) , 10.1016/S0165-0114(99)80004-9
K. Atanassov, G. Gargov, Interval-Valued Intuitionistic Fuzzy Sets ,(2019)
N.P Archer, F Ghasemzadeh, An integrated framework for project portfolio selection International Journal of Project Management. ,vol. 17, pp. 207- 216 ,(1999) , 10.1016/S0263-7863(98)00032-5