作者: Michael T. Sparago
DOI:
关键词:
摘要: A method of selective corrosion rate analysis is shown for generating an inspection and replacement schedule a fluid processing plant. The includes the steps identifying system from division plant into one or more systems wherein each has mechanical components that are expected to experience common environment, at least thickness measurement location performing inspections. next establishing data running through plurality engineering models. Running models coordinating locations physical relationship groups, applying statistical distribution/goodness-of-fit tests group. final step selecting best fitting model containment within In preferred embodiment analysis, additional sub-populations application so identification such assists user in unknown mechanisms, specific schedules sub-populations.