摘要: "This report presents the findings of a comprehensive research project to investigate fatigue cracking and failure galvanized high mast illumination poles (HMIP)."

参考文章(10)
Amir Mirmiran, Nakin Suksawang, Brandon Mintz, Remedial Action for Failed Pole/Base Plate Weld on High Mast Lighting Pole (HMLP) ,(2009)
Andrew Stam, Nicholas Richman, Charles Pool, Craig Rios, Thomas Anderson, Karl Frank, None, Fatigue Life of Steel Base Plate to Pole Connections for Traffic Structures University of Texas at Austin. Center for Transportation Research.. ,(2011)
I.F.C. Smith, G. L. Kulak, J. W. Fisher, A Fatigue Primer for Structural Engineers National Steel Bridge Alliance, American Institute of Steel Construction. ,(1998)
L. Mraz, J. Lesay, Problems with reliability and safety of hot dip galvanized steel structures Soldagem & Inspecao. ,vol. 14, pp. 184- 190 ,(2009) , 10.1590/S0104-92242009000200011
J. Carpio, J.A. Casado, J.A. Álvarez, D. Méndez, F. Gutiérrez-Solana, Stress corrosion cracking of structural steels immersed in hot-dip galvanizing baths Engineering Failure Analysis. ,vol. 17, pp. 19- 27 ,(2010) , 10.1016/J.ENGFAILANAL.2008.11.005
R. D. Blevins, H. Saunders, Flow-Induced Vibration ,(1977)
Richard Aichinger, Warren Higgins, Toe Cracks in Base Plate Welds — 30 Years Later Electrical Transmission Line and Substation Structures: Structural Reliability in a Changing World. pp. 274- 285 ,(2006) , 10.1061/40790(218)25