作者: Hussan Al-Chalabi , Hadi Hoseinie , Jan Lundberg
DOI: 10.1007/978-3-319-23597-4_46
关键词:
摘要: Drilling rigs are widely used in mine development or construction and tunnel engineering projects. The rig consists of 12 subsystems a series configuration can be driven by diesel electrical engines. This paper uses the Kamat-Riley (K-R) event-based Monte Carlo simulation method to perform reliability analysis an underground drilling rig. For data increase statistical accuracy, discusses three case studies Sweden. Researchers built process programme MATLABTM software run simulations. results showed approach is applicable this Moreover, all reaches almost zero value after 50 h operation. Finally, differences between studied fleet maximum 10 %. Therefore, maintenance spare part planning issues managed similar way.