作者: G.S. Ger , D.G. Hwang , W.Y. Chen , S.E. Hsu
DOI: 10.1016/0167-8442(88)90007-9
关键词:
摘要: … The design procedure follows the flow chart in Fig. 1. The dome helical and cylindrical hoop … between line pressure (MEOP) and the high pressure water supply. A waste-water valve …