作者: E.R. Oxburgh , S.W. Richardson , D.L. Turcotte , A. Hsui
DOI: 10.1016/0012-821X(72)90077-5
关键词:
摘要: Abstract The accurate determination of bore hole temperatures must generally be delayed until the drilling induced temperature transients have decayed to a negligible value. A numerical analysis thermal structure bottom region during brief cessations shows that after few hours dependence perturbation on time becomes linear log-log plot. This allows equilibrium ±0.005°C. method has been partially tested in Steeple Aston borehole, Oxfordshire, England, and may make possible rapid inexpensive measurements heat flow.