作者: Muhammad Ali , Julija Matevosyan , J.V. Milanović
DOI: 10.1016/J.EPSR.2012.01.019
关键词:
摘要: Abstract Energy yield (EY) evaluation of a wind farm (WF) is essential for profit estimation and such analysis usually part the pre-feasibility study any WF. output from WF can vary because several factors including site location layout. It therefore to estimate EY accurately taking into account as many realistic effects possible. Both energy well transfer grid are vital information. In this paper, methodologies provided calculate losses due wake effect, internal collector system, new method unavailability turbine (WT) components. A novel curtailments network transmission bottlenecks also presented considering four systems. Correlations between incoming speed (WS), WT availability Transmission Line Loading (TLL) used determine range possible scenarios. Impact resource variation (at site) on curtailed analysed.