作者: Yinghui Yu
DOI:
关键词:
摘要: A measurement control method, a UE, and network-side device are provided to solve the problem in prior art that no solution can ensure UE perform obtain result time, as well reduce impact of on performance UE. The method includes following steps. receives indication information by network side; performs after determining needs according information, which ensures may not frequently but pertinently, reduces utmost extent.