作者: Bin Yang , Zhichen Wang , Boda Liu , Binghan Zhang , Dayu Zhu
DOI: 10.3390/SU13105478
关键词:
摘要: Currently, construction projects are getting more complex, applying information and communication technologies (ICT), while few studies use real-time data to dynamically optimize construction. The purpose of this article is study the current development status optimization applied in phase their potential for real collected by ICT. This reviews 72 relevant methods identified some ICT research that can provide them with dynamic data. triggering mode each first analyzed, then its way, data, resource, object, method formulated. results reveal great value dealing complicated uncertain contextual conditions Different modes have different affinities Then, through analysis articles, huge these shown. paper points out most practical engineers or managers continuously apply solve problems construction, put forward scientific questions related researchers: How does one combine event dynamics parameters? Based on this, gap area a conceptual solution proposed.