作者: Minkyu Kim , Bon Joo Koo , None
DOI: 10.7846/JKOSMEE.2015.18.4.310
关键词:
摘要: − The intertidal area in Lake Sihwa formed after operation of Sihwa-Lake tidal power plant and the change by period were analyzed. For computation area, remote sensing techniques applied high resolution Digital Elevation Model (DEM) was generated with root mean square (rms) error 14.4 cm. 165.1 km 1910s, 115.2 1991 before completion dyke, 5.6 2010 during on sluice gate, 20.3 2013 plant. Intertidal nearly dissipated but significantly increased from April 2012 as developing a regular tide environment increasing sea water flux. re-formation flat is an uncommon case. This study that precisely analyzed artificially would be applicable for management making conservation plan.