作者: G. Ballard , G. Howell
DOI: 10.1061/(ASCE)0733-9364(1998)124:1(11)
关键词:
摘要: Effective production control systems are structured around the assignment as unit of analysis. The quality work assignments in units such construction crews and engineering squads is key to for determining productivity. Research has revealed that can be substantially improved by forming selecting them meet soundness, sequence, size criteria. Quality shield from flow uncertainty, enabling those improve their own productivity, also productivity downstream. associated reduction task duration shorten projects. Further project comes shortening buffers previously needed accommodate uncertainty.