High voltage power supplies for the neutral beam injectors of the stellarator TJ-II

作者: J Alonso , M Liniers , L Martı́nez Laso , E Jauregi , C Lucı́a

DOI:

关键词:

摘要: Neutral beam injection will be available for the second experimental phase of TJ-II. Two injectors, set in co-counter configuration, will inject into the plasma two 40 keV H0 beams, each of up to 1 MW. The two high voltage power supplies to feed the acceleration grids of the injectors, described in this paper, are of the transformer–rectifier type, taking their primary energy from a pulsed flywheel generator, and are coupled to the acceleration grids through a switching device. This environment effectively sets the main operation limits and protection requirements of the power supplies.