Finding stable system designs: a reverse simulation technique

Rosemary H. Wild , Joseph J. Pignatiello
Communications of The ACM 37 ( 10) 87 -98

16
1994
Identifying the time of step change in the mean of autocorrelated processes

Marcus B. Perry , Joseph J. Pignatiello
Journal of Applied Statistics 37 ( 1) 119 -136

11
2010
Identifying the time of change in the mean of a two-stage nested process

Marcus B. Perry , Joseph J. Pignatiello
Journal of Applied Statistics 39 ( 2) 419 -433

1
2012
A response to Kleij nen's note on Wild and Pignatiello's experimental design strategy:

Rosemary H. Wild , Joseph J. Pignatiello
international conference on advances in system simulation 58 ( 6) 395 -396

1992
An experimental design strategy for designing robust systems using discrete-event simulation:

Rosemary H. Wild , Joseph J. Pignatiello
international conference on advances in system simulation 57 ( 6) 358 -368

43
1991
On constructing T 2 control charts for retrospective examination

Gunabushanam Nedumaran , Joseph J. Pignatiello
Communications in Statistics - Simulation and Computation 29 ( 2) 621 -632

13
2000
ARL-Design ofSCharts withk-of-kRuns Rules

Cesar A. Acosta-Mejia , Joseph J. Pignatiello
Communications in Statistics - Simulation and Computation 38 ( 8) 1625 -1639

20
2009
Estimating the time of step change with Poisson CUSUM and EWMA control charts

Marcus B. Perry , Joseph J. Pignatiello
International Journal of Production Research 49 ( 10) 2857 -2871

14
2011
Quality by design

Susan M Sanchez , JS Ramberg , J Fiero , JJ Pignatiello
Concurrent engineering: Automation, tools, and techniques 236 -286

38
1993
Discussion on Kackar's paper

JJ Pignatiello , JS Ramberg
Journal of Quality Technology 17 ( 4) 198 -209

155
1985
Radial basis function neural network for Kraft pulping forecasting

CC Chiu , DF Cook , JJ Pignatiello
International Journal of Industrial Engineering 2 ( 2) 209 -215

7
1995
Simultaneous monitoring for process location and dispersion without subgrouping

CA Acosta , JJ Pignatiello
5th Industrial Engineering Research Conference Proceedings 693 -698

4
1996
Process capability: Engineering and statistical issues

JJ Pignatiello , JS Ramberg
QUALITY AND RELIABILITY 47 407 -434

3
1996
Statistical process control of continuous materials using on-line machine vision

SR Kona , JW Foster , JJ Pignatiello
PROC IND ENG RES CONF, IIE, NORCROSS, GA,(USA), 1993, 107 -111

1
1993
Monitoring the variability of symmetric processes.

CA Acosta-Mejia , JJ Pignatiello , JR Simpson
International Journal of Industrial Engineering: Theory, Applications and Practice 9 ( 2) 151 -161

2002
On estimating &unknown; X control chart limits

G Nedumaran , JJ Pignatiello
QUALITY CONTROL AND APPLIED STATISTICS 47 ( 2) 127 -130

2002
Monitoring process dispersion without subgrouping

CA Acosta-Mejia , JJ Pignatiello
QUALITY CONTROL AND APPLIED STATISTICS 46 ( 3) 245 -246

2001
Identifying the time of a change in a Poisson rate parameter

Thomas R Samuel , JJ Pignatiello
QUALITY CONTROL AND APPLIED STATISTICS 44 245 -246

1999
Identifying the time of a step change with X control charts

TR Samuel , JJ Pignatiello , JA Calvin
QUALITY CONTROL AND APPLIED STATISTICS 44 387 -388

1999
TOP TEN TRIUMPHS AND TRAGEDIES OF GENICHI TAGUCHI

JOSEPH J. PIGNATIELLO , JOHN S. RAMBERG
Quality Engineering 4 ( 2) 211 -225

104
1991