Simulation-based planning and control: From shop floor to top floor

作者: Seungyub Lee , Young-Jun Son , Richard A. Wysk

DOI: 10.1016/J.JMSY.2007.07.001

关键词: EngineeringIndustrial engineeringControl systemControl environmentSimulation modelingEngineering drawingWork (electrical)Resource (project management)Construct (python library)Web serviceControl (management)

摘要: Abstract This paper illustrates how simulation-based shop-floor planning and control can be extended to enterprise-level activities (top floor). First, the general concept are discussed, followed by an overview of control. Analogies between shop floor top discussed in terms components required construct systems. developed for resource models, coordination physical entities, simulation models. Differences also order identify new challenges faced top-floor A major difference is way a model constructed use planning, depending on whether time synchronization among member simulations becomes issue or not. Another distributed communication/computing platform. work uses computing platform using Web services technology integrate heterogeneous systems environment. The research results reveal that extensible environment’s evolving challenges.

参考文章(34)
Judith Dahmann, Richard Weatherly, Frederick Kuhl, Creating Computer Simulation Systems: An Introduction to the High Level Architecture ,(1999)
Richard A. Wysk, Young Jun Son, Héctor Rodríguez-Rivera, A multi-pass simulation-based, real-time scheduling and shop floor control system Transactions of The Society for Computer Simulation International. ,vol. 16, pp. 159- 172 ,(1999) , 10.5555/340538.340544
Jay Steele, Young-Jun Son, Richard A. Wysk, Resource modeling for the integration of the manufacturing enterprise Journal of Manufacturing Systems. ,vol. 19, pp. 407- 427 ,(2001) , 10.1016/S0278-6125(01)80012-1
Kitae Shin, Choon Seong Leem, A reference system for internet based inter-enterprise electronic commerce Journal of Systems and Software. ,vol. 60, pp. 195- 209 ,(2002) , 10.1016/S0164-1212(01)00092-9
Douglas M. Lambert, Sebastián J. García-Dastugue, Keely L. Croxton, AN EVALUATION OF PROCESS‐ORIENTED SUPPLY CHAIN MANAGEMENT FRAMEWORKS Journal of Business Logistics. ,vol. 26, pp. 25- 51 ,(2005) , 10.1002/J.2158-1592.2005.TB00193.X
ALBERT JONES, LUIS RABELO, YUEHWERN YIH, A hybrid approach for real-time sequencing and scheduling International Journal of Computer Integrated Manufacturing. ,vol. 8, pp. 145- 154 ,(1995) , 10.1080/09511929508944638
Seungho Lee, Xiaobing Zhao, Ameya Shendarkar, Karthik Vasudevan, Young-Jun Son, None, Fully dynamic epoch time synchronisation method for distributed supply chain simulation Journal of Computer Applications in Technology. ,vol. 31, pp. 249- 262 ,(2008) , 10.1504/IJCAT.2008.018161
YOUNG JUN SON, RICHARD A. WYSK, ALBERT T. JONES, Simulation-based shop floor control: formal model, model generation and control interface Iie Transactions. ,vol. 35, pp. 29- 48 ,(2003) , 10.1080/07408170304428
Rajeev Motwani, John E. Hopcroft, Jeffrey D. Ullman, Rotwani, Introduction to Automata Theory, Languages, and Computation ,(1979)
Young-Jun Son, Sanjay B. Joshi, Richard A. Wysk, Jeffrey S. Smith, Simulation-based shop floor control Journal of Manufacturing Systems. ,vol. 21, pp. 380- 394 ,(2002) , 10.1016/S0278-6125(02)80036-X