A procedure for multi-criteria selection of building assemblies

作者: K. Nassar , Walid Thabet , Yvan Beliveau

DOI: 10.1016/S0926-5805(03)00007-4

关键词: Selection (genetic algorithm)Building designVisual BasicSet (abstract data type)Analytic hierarchy processArchitectureMaterial selectionEngineeringOptimal designEngineering drawing

摘要: During some of the different building design stages, typical construction materials/components are often grouped together to form what is called assemblies. One most important tasks in development stage selection appropriate assemblies be used various elements building, e.g. walls, roofs, floors and so on. This decision will have a significant impact on performance with respect criteria. Although this cannot entirely separated from other use decision-making techniques can render more rational decision. In paper, computer tool developed for selecting best combination each particular situation. The utilizes existing models single comprehensive procedure. described procedure, selected by finding trade-off between set designer-specified analytical hierarchy process (AHP) determine relative importance weights addition, methods determining an aggregated criteria alternative solution described. A heuristic algorithm search assembly among prototype that implements procedure Visual Basic as add-in AutoCad.

参考文章(10)
William D. Mahoney, Means (Firm), Means graphic construction standards R.S. Means Co.. ,(1986)
R D Coyne, Modelling the Emergence of Design Descriptions across Schemata Environment and Planning B-planning & Design. ,vol. 18, pp. 427- 458 ,(1991) , 10.1068/B180427
Makarand Hastak, Advanced automation or conventional construction process Automation in Construction. ,vol. 7, pp. 299- 314 ,(1998) , 10.1016/S0926-5805(98)00047-8
Thomas L. Saaty, Decision making for leaders systems man and cybernetics. ,vol. 15, pp. 450- 452 ,(1985) , 10.1109/TSMC.1985.6313384
R D Coyne, M Yokozawa, Computer Assistance in Designing from Precedent Environment and Planning B-planning & Design. ,vol. 19, pp. 143- 171 ,(1992) , 10.1068/B190143
Nie-Jia Yau, Jyh-Bin Yang, Applying case-based reasoning technique to retaining wall selection Automation in Construction. ,vol. 7, pp. 271- 283 ,(1998) , 10.1016/S0926-5805(97)00072-1
M Balachandran, J S Gero, Dimensioning of Architectural Floor Plans under Conflicting Objectives Environment and Planning B-planning & Design. ,vol. 14, pp. 29- 37 ,(1987) , 10.1068/B140029
M. BALACHANDRAN, J. S. GERO, A KNOWLEDGE-BASED APPROACH TO MATHEMATICAL DESIGN MODELING AND OPTIMIZATION Engineering Optimization. ,vol. 12, pp. 91- 115 ,(1987) , 10.1080/03052158708941087
Yehuda E Kalay, Performance-based design Automation in Construction. ,vol. 8, pp. 395- 409 ,(1999) , 10.1016/S0926-5805(98)00086-7
Th. Bax, R. Oxman, T. Cornick, S. Bull, Expert Systems for Detail Design in Building computer aided architectural design futures. ,vol. 7, ,(1988)