ESTIVATE: a model for calculating excavator productivity and output costs

作者: DAVID J. EDWARDS , GARY D. HOLT

DOI: 10.1108/EB021132

关键词: Instruction cycleSwingStatisticsCost estimateRegression analysisCoefficient of determinationCorrelation coefficientEngineeringExcavatorEstimator

摘要: Hydraulic excavator cycle time and associated unit costs of excavation for given input estimating data, machines operating in the UK construction industry, are predicted. Using multiple regression analysis, three variables identified as accurate predictors time: machine weight, digging depth swing angle. With a coefficient determination (R2) 0.88, mean percentage error (MPE) −5.49, absolute (MAPE) 3.67, model is robust; this further validated using chi‐square analysis Pearson's correlation (on predicted actual values time). An illustrative example model's application to determine productivity given. The paper concludes with spreadsheet calculating (m3 cost per h) which able deal any combination independent predictor other estimator's data.

参考文章(18)
Abiodun Olanrewaju Akinsola, An intelligent model of variations' contingency on constructions projects University of Wolverhampton. ,(1997)
Ronald McCaffer, Frank Harris, Management of Construction Equipment ,(1977)
Robert J. Pavur, Alan H. Kvanli, Carl Steven Guynes, Introduction to business statistics: A computer integrated approach ,(1989)
S. D. Smith, J. R. Osborne, M. C. Forde, Analysis of earth-moving systems using discrete-event simulation Journal of Construction Engineering and Management-asce. ,vol. 121, pp. 388- 396 ,(1995) , 10.1061/(ASCE)0733-9364(1995)121:4(388)
David J. Edwards, Hamid Malekzadeh, Silas B. Yisa, A linear programming decision tool for selecting the optimum excavator Structural Survey. ,vol. 19, pp. 113- 120 ,(2001) , 10.1108/EUM0000000005628
Akintola Akintoye, Martin Skitmore, Models of UK private sector quarterly construction demand Construction Management and Economics. ,vol. 12, pp. 3- 13 ,(1994) , 10.1080/01446199400000002
A. K. W. Jayawardane, F. C. Harris, Further development of integer programming in earthwork optimization Journal of Construction Engineering and Management-asce. ,vol. 116, pp. 18- 34 ,(1990) , 10.1061/(ASCE)0733-9364(1990)116:1(18)
Serji N. Amirkhanian, Nancy J. Baker, Expert System for Equipment Selection for Earth‐Moving Operations Journal of Construction Engineering and Management. ,vol. 118, pp. 318- 331 ,(1992) , 10.1061/(ASCE)0733-9364(1992)118:2(318)
R. I. Cooper, M. C. Fleming, J. G. Nellis, Principles of applied statistics Journal of The Royal Statistical Society Series A-statistics in Society. ,vol. 158, pp. 348- 349 ,(1995) , 10.2307/2983306