作者: Qiang Zhang , Jixiong Zhang , Yanli Huang , Feng Ju
DOI: 10.1016/J.IJMST.2011.08.003
关键词: Scraper site 、 Fly ash 、 Geotechnical engineering 、 Overburden 、 Coal 、 Coal mining 、 Mining engineering 、 Engineering 、 Overburden pressure 、 Roof 、 Subsidence
摘要: Based on the principle of fully mechanized backfilling and coal mining technology and combined with the Xingtai Coal Mine conditions, we mainly optimized the coal mining equipment and adjusted the coal mining method in the Xingtai Coal Mine 7606 working face for implementation this technology. Firstly, we define the practical backfilling process as the “(from backfilling scraper conveyor's) head to tail backfilling, step by step swinging up of the tamping arm, gradual compacting, moving formed backfilling scraper conveyor when the …