作者: V A Bodnar
DOI:
关键词: Payment 、 Time saving 、 Renting 、 Economics 、 Transport engineering 、 Call for bids 、 Road traffic 、 Utilization 、 Work (electrical) 、 Schedule (workplace)
摘要: The concept of lane rental, introduced to minimise delays road traffic, is explained. Rental amounts are based on 'cost the nation' figures assessed by dtp's quadro (queues and at roadworks) program. bonus/rental charge in 1984 provided for a bonus payment contractor if he finished ahead schedule rental overran. Continuous site involved being charged daily basis occupation lane-by-lane related number configuration lanes occupied. Studies carried out between 1987 found that compared with conventional contracts time savings up 50% were achieved worth 14 million saved. During period studied there was an additional contract cost 3 but 23 avoided. different types working examined most controversial difference be weather clause. Contractors whole favour this method working. Disadvantages include difficulties supply testing materials during 24 hour An examination pressure under which staff work put shows need making quick decisions producing accurate documents. (TRRL)