A redundancy allocation problem by using utility function method and ant colony optimization: tradeoff between availability and total cost

作者: Ali Salmasnia , Sadegh Noori , Hadi Mokhtari

DOI: 10.1007/S13198-019-00800-1

关键词: Function methodRedundancy (engineering)Corrective maintenanceTotal costPrioritizationMathematical optimizationAnt colony optimization algorithmsComputer science

摘要: Redundancy allocation problem includes selection of several redundant components for allocating to a system; maximize the availability, by considering system constrains. In this regard, traditional prioritization methods have been presented which mainly addressed single-objective optimization. Moreover, methods, due high number solutions, are practically limited and best solution among efficient solutions is typically complicated. study, availability cost regarded as objective functions. The corrective maintenance all-unit discount buying substituted considered in model. To optimize model, prioritizing method with utility function ant colony optimization will be presented. robust one case existence relationship between cost. Finally, proposed investigated results examined numerical example.

参考文章(36)
Ali Salmasnia, Ehsan Ameri, Seyed Taghi Akhavan Niaki, A robust loss function approach for a multi-objective redundancy allocation problem Applied Mathematical Modelling. ,vol. 40, pp. 635- 645 ,(2016) , 10.1016/J.APM.2015.06.007
Kaveh Khalili-Damghani, Amir-Reza Abtahi, Madjid Tavana, A Decision Support System for Solving Multi‐Objective Redundancy Allocation Problems Quality and Reliability Engineering International. ,vol. 30, pp. 1249- 1262 ,(2014) , 10.1002/QRE.1545
C. L. Hwang, F. A. Tillman, W. Kuo, Reliability Optimization by Generalized Lagrangian-Function and Reduced-Gradient Methods IEEE Transactions on Reliability. ,vol. R-28, pp. 316- 319 ,(1979) , 10.1109/TR.1979.5220617
Seyed Mohsen Mousavi, Najmeh Alikar, Seyed Taghi Akhavan Niaki, Ardeshir Bahreininejad, Two tuned multi-objective meta-heuristic algorithms for solving a fuzzy multi-state redundancy allocation problem under discount strategies Applied Mathematical Modelling. ,vol. 39, pp. 6968- 6989 ,(2015) , 10.1016/J.APM.2015.02.040
Harish Garg, S.P. Sharma, Multi-objective reliability-redundancy allocation problem using particle swarm optimization Computers & Industrial Engineering. ,vol. 64, pp. 247- 255 ,(2013) , 10.1016/J.CIE.2012.09.015
Krishna B. Misra, Usha Sharma, An efficient approach for multiple criteria redundancy optimization problems Microelectronics Reliability. ,vol. 31, pp. 303- 321 ,(1991) , 10.1016/0026-2714(91)90216-T
Yong Wang, Lin Li, A PSO algorithm for constrained redundancy allocation in multi-state systems with bridge topology Computers & Industrial Engineering. ,vol. 68, pp. 13- 22 ,(2014) , 10.1016/J.CIE.2013.11.016
Hadi Mokhtari, Ashkan Mozdgir, Isa Nakhai Kamal Abadi, A reliability/availability approach to joint production and maintenance scheduling with multiple preventive maintenance services International Journal of Production Research. ,vol. 50, pp. 5906- 5925 ,(2012) , 10.1080/00207543.2011.637092
Kaveh Khalili-Damghani, Amir-Reza Abtahi, Madjid Tavana, A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems Reliability Engineering & System Safety. ,vol. 111, pp. 58- 75 ,(2013) , 10.1016/J.RESS.2012.10.009
Seyed Mohsen Mousavi, Vahid Hajipour, Seyed Taghi Akhavan Niaki, Najmeh Alikar, Optimizing multi-item multi-period inventory control system with discounted cash flow and inflation: Two calibrated meta-heuristic algorithms Applied Mathematical Modelling. ,vol. 37, pp. 2241- 2256 ,(2013) , 10.1016/J.APM.2012.05.019