作者: Z. Li
DOI: 10.1016/0167-9031(90)90543-2
关键词: Haulage 、 Matching (statistics) 、 Truck 、 Shovel 、 Optimum control 、 Engineering 、 Linear programming 、 Automotive engineering 、 Material flow 、 Open-pit mining
摘要: Abstract This paper presents a methodology for the optimum control of shovel and truck operations in open-pit mining. Particularly discussed are problems material flow planning, dispatching, equipment matching. The linear programming technique is used planning flows along paths haulage network, maximum intertruck-time deviation rule dispatching proposed facilitating implementation automated systems, least square suggested as criterion optimally matching trucks with shovels.