作者: Jean-Jacques Carrillo
DOI:
关键词: Power station 、 Topology 、 Topology (electrical circuits) 、 Engineering 、 Electric power 、 Units of measurement 、 Process (computing) 、 Schematic 、 Busbar 、 Complete graph
摘要: The process is intended to optimize the operation of a digital protection system for protecting sets busbars in power station and uses basic schematic electrical configuration obtained from information on type components used station, possible connections accesses said components. assigned management units system, comprising peripheral measurement at least one centralization unit. A topological compilation implemented provide compiled topology, assignment topology their units. partial graph, whose structure depends searched status each component complete graph then computed or more by algorithms which superpose graphs.