Process for initializing and updating the topology of a high-voltage or medium-voltage electrical power station

作者: Jean-Jacques Carrillo

DOI:

关键词: Power stationTopologyTopology (electrical circuits)EngineeringElectric powerUnits of measurementProcess (computing)SchematicBusbarComplete graph

摘要: The process is intended to optimize the operation of a digital protection system for protecting sets busbars in power station and uses basic schematic electrical configuration obtained from information on type components used station, possible connections accesses said components. assigned management units system, comprising peripheral measurement at least one centralization unit. A topological compilation implemented provide compiled topology, assignment topology their units. partial graph, whose structure depends searched status each component complete graph then computed or more by algorithms which superpose graphs.

参考文章(15)
Nobufusa Iwanishi, Kazuhiro Satoh, Noriko Ishibashi, Method for designing semiconductor integrated circuit ,(2003)
Raymond J. Nath, David R. Frost, John S. Wiesemann, Harold T. Maguire, Aristides S. Candris, Deterministic, probabilistic and subjective modeling system ,(1993)
Kazuaki Iwamura, Shinzo Matsubara, Shogo Yamaguchi, Takeo Horiguchi, Fumihiko Ikegami, Takuya Kawamura, Network construction method and communication system for communicating between different groups via representative device of each group ,(2002)
R.M. Kawakami, A.V. Garcia, A real time operation power system simulator ieee international conference on power system technology. ,vol. 2, pp. 825- 830 ,(2000) , 10.1109/ICPST.2000.897128
P.D. Yehsakul, I. Dabbaghchi, A topology-based algorithm for tracking network connectivity IEEE Transactions on Power Systems. ,vol. 10, pp. 339- 346 ,(1995) , 10.1109/59.373954
T.K.P. Medicherla, M. Chau, R.E. Zigmund, K. Chan, Transmission station reliability evaluation IEEE Transactions on Power Systems. ,vol. 9, pp. 295- 304 ,(1994) , 10.1109/59.317598